How can I lower costs without creating problems later?

Start by reviewing layout, scope, materials, and construction methods with the project team rather than simply choosing cheaper finishes. Good value engineering considers how each change affects performance, maintenance, and the way your business will use the building.

Take a closer look

Open any section for the questions, checks and decisions behind the short answer.

Before reviewing cost reductions, identify the business outcomes you want to protect. That might include a dependable production area, durable customer spaces, a particular delivery arrangement or room for additional equipment. Ask the operating team which changes would make daily work harder. Give those priorities to the designers and contractor.

Have the design team identify the safety, accessibility, structural and other applicable performance requirements that proposed alternatives must satisfy. Then distinguish essential business features from preferences and possible future work. This gives the team a clear basis for exploring changes without treating every part of the project as equally flexible.

Ask whether the proposed spaces are the right size for the way you will use them. Review circulation, storage, support areas and the relationship between equipment and the people operating it. Consider whether a simpler layout or fewer one-off details could meet the same goals. Ask the team to price the promising options before treating them as savings.

For an existing building, discuss what can appropriately remain in place and what needs replacement. For new work, ask whether more consistent dimensions, materials or repeated details are worth studying. These are questions for the project team to test. The effect depends on quantities, labor, site conditions and the requirements of the finished building.

The Department of Energy’s life-cycle-cost guidance includes equipment and installation, energy, maintenance, repairs, replacement and disposal. For systems or products that affect ongoing expenses, ask for a comparison using the same operating assumptions and performance needs. A purchase-price comparison alone leaves those future costs out.

Have the team explain the assumed operating hours, service life, maintenance needs and energy prices. Ask what happens if those assumptions change. Use a deeper life-cycle analysis where the size of the decision justifies it; DOE also provides building life-cycle-cost tools. The goal is a decision you understand, with the important assumptions visible.

For each suggestion, ask the team to trace its effect on related work. Would a different product change supports, connections, access for maintenance or adjacent finishes? Would the design documents need revision? Is the proposed item available on the schedule being discussed? Have the relevant designers and trades evaluate those questions before accepting a price credit.

Also ask who will confirm the alternative meets the intended performance and any applicable approval requirements. AIA’s design-phase guidance describes construction documents as the information used to price and build the project. Approved changes should make their way into that coordinated information, so the team is pricing and constructing the same solution.

Request a short written comparison of the original scope and the alternative. Include the stated credit or added cost, related work, design effort, possible schedule effects and remaining assumptions. Ask whether the quoted change accounts for everything affected or only one portion of the work. Keep estimated savings separate from accepted changes.

If you are considering postponing part of the project, ask how it would be added later. Have the team identify any preparation worth doing now and the likely disruption of returning after the business is operating. Decide whether the deferred scope fits your actual growth plans.

Once you choose an option, record the decision and confirm which drawings, specifications, pricing and schedules need updating. Review the remaining budget gap after accepted changes. Avoid counting the same saving twice or treating an unresolved proposal as money already removed from the project.

Edge Crew’s Halsell Street office in Bridgeport.

Owner tool: review each cost-saving idea

Use the following questions for each proposed alternative. Keep the completed comparison with the project decisions.

01

What exactly changes, and which business requirement does the alternative still satisfy?

02

What is the net cost effect after related work and design changes are included?

03

Which performance, durability, maintenance and operating assumptions support the comparison?

04

Who has reviewed compatibility with the design and applicable project requirements?

05

What happens to purchasing, installation, the schedule and any future expansion?

06

Who approves the decision, and which project documents must be revised?

A useful cost reduction has a clear scope, an understood trade-off and a decision the entire team can carry forward.

This guide offers general planning questions. Your contract, design documents, property conditions and applicable approvals determine the requirements for your project.