Payments commonly follow progress-based payment applications, with the contract defining how completed work, stored materials, and any retainage are handled. Establish the review process and coordinate with your lender early so funding and payment expectations are clear.
Open any section for the questions, checks and decisions behind the short answer.
Review the billing method, submission requirements, reviewer, and payment timing in your signed contract. A lump-sum project and a cost-of-the-work project can require different supporting detail. Do not assume a payment form, billing frequency, or deposit arrangement from another project applies here.
Agree on a contact list and a submission checklist. Identify who receives the package, who checks construction progress, who resolves questions, and who arranges funding. Include the architect or other contract administrator if the agreement assigns that role.
Ask the contractor to explain the schedule of values: the breakdown of the contract amount into portions of work. Review whether the categories are clear enough to follow throughout construction. A useful breakdown lets you discuss a particular scope instead of debating one overall percentage.
AIA G702 and G703 provide one common model. They connect the overall payment request to line-item progress and show items such as contract changes, work completed, eligible stored materials, retainage, and previous payment information. Their use does not mean every project has identical terms.
When reviewing a package, compare it with the prior period and current contract records. Ask about unexpected movement in a line item, a change that you cannot match to the project records, or a stored-material amount that now appears as installed work. Request an explanation through the established review process.
Keep the contractor’s requested amount, the amount certified or otherwise approved under the contract, and the amount actually paid distinguishable. In the standard G702 process, the contractor applies, the architect reviews and certifies, and the owner pays. Other delivery arrangements may assign those steps differently.
A payment application may include materials purchased for the project before installation, if the contract permits it and its conditions are met. That raises practical questions: what was purchased, where is it, how is it identified for this project, and when is delivery expected?
AIA’s A201 framework addresses protection of the owner’s interest in stored materials, including title-related procedures and relevant insurance, storage, and transportation considerations. Ask the project team which requirements apply to your agreement and which records demonstrate compliance.
If your lender has separate documentation or inspection requirements for off-site storage, identify them before the purchase is placed in a draw request. A supplier invoice alone may not answer every question in the contract or funding process.
Ask your lender what must happen before funds can be released: its required package, review, inspection, signatures, or other conditions. Then compare those steps with the construction contract’s billing and payment provisions. Raise any mismatch early rather than assuming the two processes already align.
Create a shared calendar showing the application cutoff, reviewer availability, anticipated lender submission, and contractual payment date. Treat lender processing estimates as planning inputs and confirm how exceptions are handled.
If a package is incomplete or an amount is questioned, identify the specific item and the person responsible for resolving it. Ask your contract administrator or counsel how the agreement and applicable requirements address disputed and undisputed amounts. Avoid informally rewriting payment terms through email.
References: AIA: Construction payment processes
Retainage is an amount held back from otherwise payable amounts when the governing requirements provide for it. Whether it applies, how it is calculated, and when it can be reduced or released depend on the contract and applicable law. There is no single percentage or release date to assume for every commercial project.
Before closeout, ask for the final-payment checklist in your agreement. It may call for specified releases, warranties, or other records. Confirm who prepares and reviews each item, and distinguish the project’s completion milestones from the conditions for final payment.
Have your adviser review required waiver or release language where appropriate. This guide explains the workflow; project-specific payment rights and obligations need to be checked against your documents.
Community Bank, Springtown. Portfolio photograph; payment terms depend on each project’s agreement.
Keep one short record for each application so questions and payment status remain easy to trace.
Application number, billing period, and date received
Current contract amount and referenced changes
Completed work, eligible stored materials, and retainage shown
Required supporting documents received or missing
Reviewer, open questions, and responsible person
Amount requested, amount certified or approved, and amount paid
Lender status, contractual payment date, and payment record
This guide offers general planning questions. Your contract, design documents, property conditions and applicable approvals determine the requirements for your project.
Three generations of building knowledge. A family in North Texas that takes your project personally.
Based in Bridgeport, Wise County. Serving Wise, Denton, Tarrant, Parker and Dallas counties.
© 2026 Edge Crew Construction. All rights reserved.