OWNER INSIGHTS · EDGE CREW COMMERCIAL
Look for a documented quality process that includes contractor checks, appropriate design-team involvement, required inspections, and follow-through on identified issues. Ask how the team verifies work against the plans and specifications, especially before it is covered up.
Open any section for the questions, checks and decisions behind the short answer.
You do not need to become a construction inspector to ask useful questions. Start with the process: who checks each kind of work, what they compare it against, how they record a concern, and who confirms a correction.
AIA’s quality-control guidance identifies inspections, testing, documentation, and assigned quality procedures as parts of a construction quality process. For an owner, the practical request is straightforward: ask the contractor to explain how those activities apply to this project and show you a recent example.
The answer should be specific enough to follow. For example, ask how the team confirms that installed products match the approved selections and that current drawings are available to the people doing the work.
Contractor quality control, design-team observations, and required inspections have different roles. Ask how the project assigns them instead of assuming one person’s visit covers every requirement.
The contractor’s checks address its work and coordination. Design professionals perform the construction-phase services in their agreements. Under the AIA B101 arrangement described in the G711 field-report guidance, the architect’s observations are not exhaustive or continuous inspections of all work. Other agreements may define a different scope.
Building officials and required special inspectors have their own responsibilities. Testing agencies or commissioning providers may also be involved where required or included. Request a simple list of the applicable roles, contacts, reports, and review points.
Ask which upcoming activities will hide work from view. Examples may include placing concrete, backfilling underground work, closing walls, or finishing ceilings. The project team should identify the checks, tests, and approvals needed before those steps.
Fort Worth’s inspection guidance, for example, requires permitted work to remain accessible and exposed for inspection until approved. Other jurisdictions have their own procedures. Have your team confirm the requirements for the actual project location rather than copy another city’s list.
Ask whether any correction or unresolved design question could affect the next closure. Photographs can help explain conditions and preserve a record, but required inspections and testing still need to occur. Follow the contractor’s site-access and safety arrangements when visiting.
A useful issue record makes the location and concern easy to understand. Ask for the relevant plan or specification reference when appropriate, a responsible person, the proposed next step, and the evidence needed to close it.
For example, for a finish concern, a photo labeled with the room and wall is more useful than a general note saying the paint looks wrong. The team can then compare the work with the approved product, sample, and applicable requirements. Technical concerns should be evaluated by the qualified team members responsible for that work.
A reported correction needs follow-through. Ask who reviewed the result and whether a repeat test or inspection was required. Keep unresolved items visible even when surrounding work is progressing.
Appearance provides only part of the picture. For systems covered by the project’s testing or commissioning requirements, ask which results demonstrate that the systems work as intended. Commissioning documentation may include test results and an issues-and-resolution record.
Confirm whether any required testing remains and who is responsible for completing it. The NIBS commissioning guidance recognizes that some testing may depend on seasonal conditions. Where that applies, the closeout plan should identify the remaining work and how its results will be documented.
An occupancy approval is an important regulatory milestone. It should not be treated as a warranty or a guarantee that every contractual quality obligation has been satisfied. Keep the project’s quality and closeout records alongside the applicable approval records.
Inside Texas Jet 4C in Fort Worth.
Use these questions to understand the quality process without directing trade work or trying to perform technical inspections yourself.
What important work will be covered before our next review?
Which contractor checks, design reviews, inspections, or tests apply to that work?
Are the current plans, approved products, and relevant review records available?
Which quality issues are still open, and who is responsible for each correction?
What evidence will show that the correction is complete, and who will confirm it?
This guide offers general planning questions. Your contract, design documents, property conditions and applicable approvals determine the requirements for your project.
Three generations of building knowledge. A family in North Texas that takes your project personally.
Based in Bridgeport, Wise County. Serving Wise, Denton, Tarrant, Parker and Dallas counties.
© 2026 Edge Crew Construction. All rights reserved.