What should I receive when construction is finished?

Your handover should address the closeout documents and training required by your contract, such as warranties, operating manuals, applicable record drawings, and service contacts. Any remaining punch-list items should have clear responsibilities and a plan for completion.

Take a closer look

Open any section for the questions, checks and decisions behind the short answer.

Start with the signed contract and specifications. Ask the team to identify required closeout items while construction is still underway, with someone assigned to collect each item and someone responsible for reviewing it. AIA’s closeout guidance recommends assembling this information as the work progresses.

Use one shared list to show what is required, received, under review, or still missing. Depending on the project, the list may include warranties, manuals, drawings, testing records, training, keys, spare materials, and payment-related documents.

Agree on delivery format and access. A folder full of files is harder to use when names are unclear, links expire, or equipment cannot be matched to its documentation. Have the person who will operate the space test the handover package.

Request the drawings and other project records required by your agreement. Ask who prepared each record, what information it incorporates, and whether any information was field-verified. Keep the original design documents and subsequent project records clearly identified.

Record drawings can reflect changes reported during construction. Their accuracy and preparation requirements vary. The AIA–MBA Joint Committee cautions against assuming that drawings compiled from construction information precisely show every installed condition. Do not assume a record drawing is a certified survey or sufficient verification for future drilling, cutting, or excavation.

For example, during a future remodel, a record drawing may help the new team understand an earlier layout. That team still needs to determine what must be investigated or verified before changing the building.

Ask for an equipment index that connects the installed item to its location, model, available identification information, manual, and service contact. Where the contract calls for spare parts or extra finish materials, verify what was delivered and where it is stored.

For each warranty, identify the provider, covered item, applicable start and end dates, reporting process, and stated conditions. Coverage periods and responsibilities depend on the particular documents. Avoid assuming that every warranty begins on the same date or includes the same work.

AIA’s facility-handover guidance also emphasizes maintenance information and vendor contacts. Assign someone on the owner’s side to organize required maintenance and retain records. Ask the relevant provider to clarify unclear terms rather than rely on a verbal summary.

Bring the people who will run the building into the training plan. Ask them to identify the tasks they need to understand, such as normal controls, scheduling, routine maintenance, and how to obtain qualified service. Training should match the systems installed and the services included in the contract.

Use the actual manuals during training. Have attendees locate the instructions and identify whom to call if something behaves unexpectedly. Confirm how keys, authorized system access, and any required software information will be transferred securely.

Where commissioning applies, ask for the required reports and any remaining testing plan. NIBS guidance connects systems documentation with owner training and recognizes that some tests may extend into operation. Record what remains instead of allowing an incomplete test to disappear into the handover folder.

Walk the remaining-work list with the team. Each item should identify the location, required action, responsible party, and planned completion. Ask how access will be coordinated once your business is operating and how completion will be reviewed.

Clarify the project’s completion milestones. Substantial completion, final completion, occupancy authorization, and final payment can have different requirements. Your contract and the applicable authorities determine what each means for your project. An occupancy permit does not guarantee workmanship or replace warranty documents.

Before final closeout, review outstanding requirements with the people administering the contract. Payment, releases, and other legal or financial documents deserve the appropriate professional review. The goal is a handover that supports both a clear project record and the building’s day-to-day operation.

Completed office spaces at Halsell Street in Bridgeport.

Owner tool: handover readiness check

Before accepting the handover package as complete, ask your team to demonstrate these six things.

01

I can find the contract’s closeout checklist and see every unresolved item.

02

I can match important installed equipment to its manual and service contact.

03

I can identify warranty dates, conditions, and the process for reporting an issue.

04

My operating team has received the required training and can find the supporting instructions.

05

I know what the record drawings contain and what still requires field verification.

06

Remaining work and testing have assigned responsibilities, access arrangements, and a documented completion plan.

This guide offers general planning questions. Your contract, design documents, property conditions and applicable approvals determine the requirements for your project.